20mnv6 St52 E470 Cold Drawn Seamless Carbon Steel Tube for Bollard
PART I: PRODUCT INTRODUCTION: 1. Commodity: Cold drawn seamless carbon steel tube for bollard3. Size range: 70mm-325mm i;
Basic Info.
Model NO. | CXST-1 |
ID Tolerance | H8, H9 |
Bore Roughness | Ra0.25um Max |
Bore Treatment | Honing, Skiving&Roller Burnishing |
Transport Package | Standard Export Packing or Customized Packing |
Specification | 40mm*30mm-580mm*500mm |
Trademark | Chengxin, OEM |
Origin | Jiangsu, China |
HS Code | 7304319000 |
Production Capacity | 24000 Tons/Year |
Product Description
PART I: PRODUCT INTRODUCTION:1. Commodity: Cold drawn seamless carbon steel tube for bollard3. Size range: 70mm-325mm in OD.4. Available steel grade:SAE/AISI: | 1020,1026,1518,1524 |
DIN: | ST52, ST52.3, ST52.4 |
EN: | E355, C45E, E410, E470, 20MnV6 |
GB: | 20#, 45#, 16Mn, Q345B, Q345C, Q345D, Q345E, 25Mn, 27SiMn, |
BKW | BKS | GBK | NBK |
+LC | +SR | +A | +N |
Cold drawn | Stress relieved | Annealed | Normalized |
20MnV6 COLD DRAWN SEAMLESS TUBES:
PART II: FREQUENTLY ASKED QUESTIONS
1. MOQ: Generally Min Order Quantity can be 2-3 tons/size for tubes with OD below 250mm, and 10 tons/size for tubes with OD above 250mm. Sometimes, it depends on steel grade you need. If you need special grade like E410, E470 or alloy steel tube, MOQ should be 10 tons/size at least. 2. Delivery Time: Generally, our delivery time for honed tubes is around 40-60 days depending on the sizes and quantities. It will take us 15-30 days to get raw material. For example, if you need 3 tons of small size honed tubes 50mm*40mm with roughness of Ra0.25um max, it will take us at least 30 days to hone this size. 3. Warranty&Guarantee: Warranty&guarantee period is 6 months since we deliver the tubes, and we are not responsible for quality problem caused by wrong unloading or storage after shipment. We welcome customer's inspection before shipment. 4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about customers. We have a solution to evaluate the credit of customers from all over the world, and time and amount of D/P we can release is determined by the evaluation.
5. Quality Control: 90% of the tubes are made from hot rolled seamless pipes. So, quality of raw material determined quality of finished tubes. We purchase raw material from stable suppliers who are leading steel mills, and we inspect the raw material as per the specifications. During our production procedure, there is inspection and quality control in every stage.
PART III: COMPANY INTRODUCTION
We are a manufacturer of cold drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm since 2002. Covering an area of about 32000M2, we have 12 standard workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our facilities covers all the production procedures from pickling, cold drawing, heat treating, saw cutting, straightening, inspection, packing to further machining &turning, cold drawing die fabrication, and equipment repairation&maintenance.
FACTORY APPEARANCE:
RAW MATERIAL STOCK:
HYDRAULIC COLD DRAWING:
MULTI-ROLLER STRAIGHTENING:
STRAIGHTENING BY PRESS:
SAW CUTTING:
LATHES:
HONING:
DEEP HOLE BORING/DRILLING:
SKIVING&ROLLER BURNISHING:
You may also like
Send inquiry
Send now